|
Incident ID |
MA01535-3009 |
|
Dam Name |
CROSBY POND DAM |
|
Downstream Hazard Potential |
S |
|
State |
MA |
|
Incident Date |
05/29/2015 |
|
Incident Type |
Failure |
|
Incident Driver |
Unknown |
|
Incident Mechanism 1 |
Unknown |
|
Incident Mechanism 2 |
|
|
Incident Mechanism 3 |
|
|
Incident Description |
The uncontrolled release of the impoundment inundated a heavily traveled road. Nobody was injured, the busy road was closed all day creating significant traffic delay issues. |
|
Named Hydrologic Event |
|
|
EAP Enacted (Y/N) due to Incident |
|
|
Fatalities (Number) |
|
|
Number of People Evacuated |
|
|
Number of Habitable Structures Evacuated |
|
|
Number of Habitable Structures Flooded |
|
|
Other Infrastructure Impacts |
Roads |
|
Economic Damages (in $) |
|
|
Volume released at failure (ac-ft) |
|
|
Response |
|
|
Additional Remarks or Updates |
The uncontrolled release of the impoundment inundated a heavily traveled road. Nobody was injured, the busy road was closed all day creating significant traffic delay issues. |
|
Incident Time |
|
|
Incident Duration |
|
|
Incident Report Produced |
|
|
Information Sources |
|
|
Owner Type |
P |
|
Dam Type |
|
|
Primary Purpose(s) |
R |
|
EAP |
NR |
|
Year Completed |
1900 |
|
Year Modified |
0 |
|
Dam Height |
9 ft |
|
Max Storage (ac-ft) |
30 ac-ft |
|
Surface Area (acres) |
0 acres |
|
River Name |
MILL BROOK |
|
Latitude |
42.4503 |
|
Longitude |
-71.3239 |
|
Regulatory Agency(ies) |
Office of Dam Safety |
|
NID Number |
MA01535 |
|
Attachments |
|