Incident ID |
MS03665-1441 |
|
Dam Name |
BROOKSTONE LAKE DAM |
|
Downstream Hazard Potential |
H |
|
State |
MS |
|
Incident Date |
06/10/2012 |
|
Incident Type |
Failure |
|
Incident Driver |
Seepage/internal Erosion |
|
Incident Mechanism 1 |
Piping |
|
Incident Mechanism 2 |
Spillway Riser Failure |
|
Incident Mechanism 3 |
|
|
Incident Description |
PIPING THROUGH CONDUIT CLOSE TO RISER |
|
Named Hydrologic Event |
|
|
EAP Enacted (Y/N) due to Incident |
No |
|
Fatalities (Number) |
|
|
Number of People Evacuated |
0 |
|
Number of Habitable Structures Evacuated |
|
|
Number of Habitable Structures Flooded |
0 |
|
Other Infrastructure Impacts |
None |
|
Economic Damages (in $) |
|
|
Volume released at failure (ac-ft) |
27 ac-ft |
|
Response |
|
|
Additional Remarks or Updates |
DAM APPEARS TO HAVE FAILED THROUGH AN OPEN JOINT IN CONDUIT NEAR TO THE RISER. EMBANKMENT MATERIAL PIPED THROUGH HOLE UNTIL A CLEAR PATHWAY TO LAKE WAS ESTABLISHED. LAKE DRAINED THROUGH HOLE. |
|
Incident Time |
|
|
Incident Duration |
|
|
Incident Report Produced |
|
|
Information Sources |
|
|
Owner Type |
P |
|
Dam Type |
RE |
|
Primary Purpose(s) |
R |
|
EAP |
Y |
|
Year Completed |
2007 |
|
Year Modified |
2013 |
|
Dam Height |
18 ft |
|
Max Storage (ac-ft) |
56 ac-ft |
|
Surface Area (acres) |
6 acres |
|
River Name |
TRIBUTARY OF TRIBUTARY OF BEAR CREEK |
|
Latitude |
32.4861 |
|
Longitude |
-90.1675 |
|
Regulatory Agency(ies) |
MS Dept. of Environmental Quality |
|
NID Number |
MS03665 |
|
Attachments |
|