|
Incident ID |
NC00021-1683 |
|
Dam Name |
MORRIS DAM |
|
Downstream Hazard Potential |
S |
|
State |
NC |
|
Incident Date |
06/07/2013 |
|
Incident Type |
Non-failure |
|
Incident Driver |
Hydrologic/flooding |
|
Incident Mechanism 1 |
Overtopping |
|
Incident Mechanism 2 |
|
|
Incident Mechanism 3 |
|
|
Incident Description |
Dam overtopped during passage of TD Andrea |
|
Named Hydrologic Event |
|
|
EAP Enacted (Y/N) due to Incident |
No |
|
Fatalities (Number) |
|
|
Number of People Evacuated |
0 |
|
Number of Habitable Structures Evacuated |
|
|
Number of Habitable Structures Flooded |
0 |
|
Other Infrastructure Impacts |
None |
|
Economic Damages (in $) |
|
|
Volume released at failure (ac-ft) |
0 ac-ft |
|
Response |
|
|
Additional Remarks or Updates |
An auxilary relief channel had to be excavated through an abutment. Threatened Swanns Station Road downstream from Dam |
|
Incident Time |
|
|
Incident Duration |
|
|
Incident Report Produced |
|
|
Information Sources |
|
|
Owner Type |
P |
|
Dam Type |
RE |
|
Primary Purpose(s) |
P |
|
EAP |
N |
|
Year Completed |
0 |
|
Year Modified |
0 |
|
Dam Height |
12 ft |
|
Max Storage (ac-ft) |
153 ac-ft |
|
Surface Area (acres) |
0 acres |
|
River Name |
JUNIPER CREEK |
|
Latitude |
35.379 |
|
Longitude |
-79.132 |
|
Regulatory Agency(ies) |
|
|
NID Number |
NC00021 |
|
Attachments |
|