|
Incident ID |
NH00297-3442 |
|
Dam Name |
FOREST LAKE DAM |
|
Downstream Hazard Potential |
L |
|
State |
NH |
|
Incident Date |
07/18/2021 |
|
Incident Type |
Non-failure |
|
Incident Driver |
Hydrologic/flooding |
|
Incident Mechanism 1 |
High Reservoir Level |
|
Incident Mechanism 2 |
Overtopping |
|
Incident Mechanism 3 |
Erosion |
|
Incident Description |
Heavy rainfall resulted in overtopping of the dam causing erosion adjacent to the concrete spillway |
|
Named Hydrologic Event |
|
|
EAP Enacted (Y/N) due to Incident |
|
|
Fatalities (Number) |
0 |
|
Number of People Evacuated |
0 |
|
Number of Habitable Structures Evacuated |
0 |
|
Number of Habitable Structures Flooded |
0 |
|
Other Infrastructure Impacts |
None |
|
Economic Damages (in $) |
Unknown |
|
Volume released at failure (ac-ft) |
|
|
Response |
Dam was sandbagged until waters receeded |
|
Additional Remarks or Updates |
|
|
Incident Time |
|
|
Incident Duration |
2 days |
|
Incident Report Produced |
Yes |
|
Information Sources |
NHDES DAM BUREAU |
|
Owner Type |
P |
|
Dam Type |
REST |
|
Primary Purpose(s) |
R |
|
EAP |
NR |
|
Year Completed |
1925 |
|
Year Modified |
0 |
|
Dam Height |
8 ft |
|
Max Storage (ac-ft) |
378 ac-ft |
|
Surface Area (acres) |
93 acres |
|
River Name |
TR ASHUELOT RIVER |
|
Latitude |
42.7988 |
|
Longitude |
-72.3697 |
|
Regulatory Agency(ies) |
NHDES DAM BUREAU |
|
NID Number |
NH00297 |
|
Attachments |
|