Incident ID |
OH00072-3536 |
|
Dam Name |
LAKE HOPE DAM |
|
Downstream Hazard Potential |
S |
|
State |
OH |
|
Incident Date |
01/03/2023 |
|
Incident Type |
Non-failure |
|
Incident Driver |
Manmade Action |
|
Incident Mechanism 1 |
High Reservoir Level |
|
Incident Mechanism 2 |
|
|
Incident Mechanism 3 |
|
|
Incident Description |
Had elevated pool during construction. Main spillway was cofferdamed off and there were 4 large siphons running. As part of the construction they had lowered the pool by at least 5 feet and lowered the top of dam as well to accomodated some of the construction. The cofferdam was breached to prevent the dam from overtopping. |
|
Named Hydrologic Event |
|
|
EAP Enacted (Y/N) due to Incident |
Yes |
|
Fatalities (Number) |
|
|
Number of People Evacuated |
0 |
|
Number of Habitable Structures Evacuated |
1 |
|
Number of Habitable Structures Flooded |
1 |
|
Other Infrastructure Impacts |
Other |
|
Economic Damages (in $) |
|
|
Volume released at failure (ac-ft) |
|
|
Response |
|
|
Additional Remarks or Updates |
The contractor's job trailer and laydown area below the dam was flooded out. |
|
Incident Time |
|
|
Incident Duration |
3 days |
|
Incident Report Produced |
Yes |
|
Information Sources |
OH Dam Safety |
|
Owner Type |
S |
|
Dam Type |
RE |
|
Primary Purpose(s) |
R |
|
EAP |
Y |
|
Year Completed |
1939 |
|
Year Modified |
0 |
|
Dam Height |
33 ft |
|
Max Storage (ac-ft) |
2461 ac-ft |
|
Surface Area (acres) |
130 acres |
|
River Name |
SANDY RUN |
|
Latitude |
39.32 |
|
Longitude |
-82.3564 |
|
Regulatory Agency(ies) |
DEPARTMENT OF NATURAL RESOURCES |
|
NID Number |
OH00072 |
|